Criteria |
JORC Code Explanation |
Commentary |
Sampling Techniques |
· Nature and quality of sampling (e.g. cut channels, random chips, or specific specialised industry standard measurement tools appropriate to the minerals under investigation, such as down hole, gamma sondes, or handheld XRF instruments etc). These examples should not be taken as limiting the broad meaning of sampling. |
· No samples have been collected yet by Harvest Minerals ("HMI"). |
· Include reference to measures taken to ensure sample representivity and the appropriate calibration of any measurement tools or systems used. |
· No samples have been collected yet by HMI. |
· Aspects of the determination of mineralisation that are Material to the Public Report. In cases where "industry standard " work has been done this would relatively simple (e.g. 'reverse circulation drilling was used to obtain 1m samples from which 3kg was pulverised to produce a 30g charge for fire assay). In other cases more explanation may be required, such as where there is course gold that has inherent sampling problems. Unusual commodities or mineralisation types ( e.g. submarine nodules ) may warrant disclosure of detailed information. |
· No samples have been collected yet by HMI. |
Criteria |
JORC Code Explanation |
Commentary |
Drilling Techniques |
· Drill types (e.g. core, reverse circulation, open hole hammer, rotary air blast, auger, Bangka, sonic etc ) and details (e.g. core diameter, triple or standard tube, depth of diamond tails, face- sampling bit or other type, whether core is oriented and if so by what method etc). |
· No drilling has been conducted yet by HMI. · The announcement includes historical core drilling data conducted by B&A Mineração in 2013. |
Drill Sample Recovery |
· Method of recording and assessing core and chip sample recoveries and results assayed. |
· No drilling has been conducted yet by HMI. |
· Measures taken to maximise sample recovery and ensure representative nature of the samples. |
· No drilling has been conducted yet by HMI. |
· Whether a relationship exists between sample recovery and grade and whether sample bias may have occurred due to preferential loss/gain of fine /course material. |
· No drilling has been conducted yet by HMI. |
Logging |
· Whether core and chip samples have been geologically and geotechnically logged to a level of detail to support appropriate Mineral Resource estimation, mining studies and metallurgical studies. |
· No drilling has been conducted yet by HMI. |
· Whether logging is qualitative or quantitative in nature. Core ( or costean, channel, etc) photography. |
· No drilling has been conducted yet by HMI. |
· The total length and percentages of the relevant intersections logged. |
· No drilling has been conducted yet by HMI. |
Sub- Sampling Techniques and Sampling Procedures |
· If core, whether cut or sawn and whether quarter, half or all core taken. |
· No drilling has been conducted yet by HMI. |
· If non-core, whether riffled, tube sampled, rotary split etc and whether sample wet or dry. |
· No drilling has been conducted yet by HMI. |
Criteria |
JORC Code Explanation |
Commentary |
|
· For all sample types, the nature, quality and appropriateness of the sample preparation technique. |
· No samples have been conducted yet by HMI. |
· Quality control procedures adopted for all sub - sampling stages to maximise representivity of samples. |
· No samples have been conducted yet by HMI. |
· Measures taken to ensure that the sampling is representative of the in situ material collected, including for instance results for field duplicate/second -half sampling. |
· No samples have been conducted yet by HMI. |
· Whether sample sizes are appropriate to the grain size of the material being sampled. |
· No samples have been conducted yet by HMI. |
Quality of Assay Data and Laboratory Tests |
· The nature quality and appropriateness of the assaying and laboratory procedures used and whether the technique is considered partial or total. |
· No assays have been conducted yet by HMI. · The announcement includes historical assays drilling data conducted by B&A Mineração in 2013. |
· For geophysical tools, spectrometers, hand held XRF instruments, etc, the parameters used in determining the analysis including instrument make and model, reading times, calibrations factors applied and their derivation etc. |
· No samples have been conducted yet by HMI. |
· Nature of quality control procedures adopted ( e.g. standards, blanks, duplicates, external laboratory checks) and whether acceptable levels of accuracy (i.e. lack of bias) and precision have been established. |
· No samples have been conducted yet by HMI. |
Verification of Sampling and Assaying |
· The verification of significant intersections by either independent or alternative company personnel. |
· No drilling has been conducted yet by HMI. · The announcement includes historical assays drilling data conducted by B&A Mineração in 2013. · The intersections mentioned in this announcement were calculated based on historical assays produced by B&A Mineração in 2013. The CP verified the intersections included in this announcement |
· The use of twinned holes |
· No drilling has been conducted yet by HMI. |
· Documentation of primary data, data entry procedures, data verification, data storage (physical and electronic) protocols. |
· No drilling has been conducted yet by HMI. |
· Discuss and adjustment to assays |
· No assays have been conducted yet by HMI. · The announcement includes historical assays drilling data conducted by B&A Mineração in 2013. |
Criteria |
JORC Code Explanation |
Commentary |
Location of Data Points |
· Accuracy and quality of surveys used to locate drill holes (collar and down hole surveys), trenches, mine workings and other locations used in Mine Resource estimation |
· To date, no exploration works have been done by HMI. · The announcement includes historical drilling location data reported by B&A Mineração in 2013. |
· Specification of grid system used |
· To date, no exploration works have been done by HMI. · Historical drilling data have been reported in Datum SAD69, UTM coordinate system Zone 24S. |
|
· Quality and adequacy of topographic control. |
· To date, no exploration works have been conducted by HMI. |
Data Spacing and Distribution |
· Data spacing for reporting of Exploration results. |
· To date, no exploration works have been conducted by HMI. |
· Whether the data spacing and distribution is sufficient to establish the degree of geological and grade continuity appropriate for the Mineral Resource and Ore Reserve estimation procedure(s) and classification applied. |
· To date, no exploration works have been conducted by HMI. |
· Whether sample compositing has been applied. |
· No samples have been collected yet. |
Orientation of Data in relation to Geological Structure |
· Whether the orientation of sampling achieves unbiased sampling of possible structures and the extent to which is known, considering the deposit type. |
· No samples have been collected yet. |
· If the relationship between the drilling orientation and the orientation of key mineralised structures is considered to have introduced a sampling bias, this should be assessed and reported if material. |
· No drilling has been conducted yet by HMI. · Drilling data reported in this announcement are historical in nature. |
Sample security |
· The measures taken to ensure sample security. |
· No samples have been collected yet by HMI. |
Audit or Reviews |
· The results of any audits or reviews of sampling techniques and data. |
· The property has not enough exploration data that supports an audits or reviews. |