22 July 2019
Resolute Mining Limited
(Resolute or the Company)
Major Gold Resource and Reserve Upgrade for Ravenswood
Mineral Resources up 24% to 5.9 Million Ounces
Ore Reserves up 58% to 2.7 Million Ounces
Addition of 1 Million Reserve Ounces
Ravenswood Expansion Project gets bigger!
Highlights
· Major upgrade in Ravenswood gold inventory net of depletion
· Ravenswood Mineral Resources have increased by 24% to 5.9 million ounces of gold
· Ravenswood Ore Reserves have increased by 1 million ounces, or 58%, to 2.7 million ounces of gold
· Strategic and technical review of the Ravenswood Expansion Project has identified efficiency and scale improvements with potential for significantly higher throughput expected to support lower unit costs and boost economic outcomes
Resolute Mining Limited (Resolute or the Company) (ASX/LSE: RSG) is pleased to announce a major upgrade in Mineral Resources and Ore Reserves for its Ravenswood Gold Mine (Ravenswood) in Queensland, Australia.
Ravenswood Ore Reserves have increased by 1 million ounces (Moz), or 58%, from 1.7Moz to 2.7Moz. Mineral Resources at Ravenswood have increased by 24% from 4.8Moz to 5.9Moz. These impressive upgrades to Resolute's available gold inventory at Ravenswood are net of depletion as at 30 June 2019.
An updated Mineral Resource estimate has been prepared for Resolute's combined Ravenswood deposits consisting of Buck Reef West, Nolans and Sarsfield. These deposits are all immediately adjacent to the Nolans Processing Plant within a radius of 1.5km2. The updated Mineral Resource stands at 270 million tonnes (Mt) at 0.7 grams per tonne (g/t Au) for 5.9Moz of gold.
Mining, metallurgical and engineering studies performed during 2019 as part of Resolute's ongoing strategic review of the Ravenswood Expansion Project (REP) have supported an updated Ore Reserve at Ravenswood of 115.4Mt at 0.7g/t Au for 2.7Moz of gold, equating to an increase of 1Moz net of depletion since the Company's last published Ore Reserve as at 31 December 2018.
Managing Director and CEO, Mr John Welborn was encouraged by the major increase of the Company's gold inventory at Ravenswood and the implications for larger scale production over a long mine life in an upgraded REP:
"One million additional ounces of gold in Ore Reserves at Ravenswood is an excellent outcome from our recent drilling programs and study work. Available gold resources at Ravenswood now exceed five million ounces demonstrating its status as an outstanding Australian gold mine. With almost three million ounces of gold in Ore Reserves we are now directing our ongoing study work to focus on an optimised REP that can produce ~200,000 ounces annually over a 15-year mine life. The expanded gold inventory demonstrates that Ravenswood presents a unique opportunity for transformation into a large scale, low cost operation with an exceptionally long mine life that will deliver considerable economic benefits to the Ravenswood community, the Queensland Government and Resolute shareholders."
The updated Ravenswood Mineral Resources and Ore Reserves, as detailed in Table 1 and 2, are reported above a cut-off grade of 0.3g/t Au and have been estimated in accordance with the JORC Code 2012.
Mineral Resources
The previously published Ravenswood Mineral Resource estimates comprised discreet models covering each of the main deposits (Buck Reef West, Sarsfield and Nolans). In order to examine opportunities to further expand future open pit operations and maximise fleet scheduling efficiencies, a new combined resource model which captures both the Buck Reef West and Sarsfield-Nolans areas was developed by MPR Geological Consultants Pty Ltd in April 2019.
Please see image in the full version of the announcement at www.rml.com.au
Figure 1: Buck Reef West, Sarsfield and Nolans pits with updated Mineral Resource block model
The Mineral Resource estimate includes recent drilling completed during 2019 and is based on sampling information within a database comprising 2,100 open hole, RC and diamond holes totalling 285,725 metres of drilling. The Mineral Resources are estimated using Multiple Indicator Kriging (MIK) with block support adjustment, a method that has been demonstrated to provide reliable estimates of recoverable open pit resources in gold deposits of diverse geological styles. Modelling of the Buck Reef West and Sarsfield-Nolans areas incorporates several mineralised domains outlining zones of varying mineralisation style and tenor.
Please see image in the full version of the announcement at www.rml.com.au
Figure 2: Cross Section through Buck Reef West and Sarsfield resource model and planned pits
The new combined Mineral Resource stands at 270Mt at 0.7g/t Au for 5.9Moz of gold. The classification and location of the new Mineral Resources are presented below in Table 1.
MINERAL RESOURCES |
MEASURED |
INDICATED |
INFERRED |
TOTAL RESOURCES |
As at 30 June 2019 |
Tonnes |
Grade |
Ounces |
Tonnes |
Grade |
Ounces |
Tonnes |
Grade |
Ounces |
Tonnes |
Grade |
Ounces |
(000s) |
(g/t) |
(000s) |
(000s) |
(g/t) |
(000s) |
(000s) |
(g/t) |
(000s) |
(000s) |
(g/t) |
(000s) |
Sarsfield/Nolans |
50,960 |
0.8 |
1,230 |
52,520 |
0.6 |
1,060 |
39,400 |
0.6 |
810 |
142,870 |
0.7 |
3,100 |
Buck Reef West |
25,480 |
0.9 |
710 |
29,630 |
0.8 |
720 |
36,950 |
0.6 |
730 |
92,060 |
0.7 |
2,160 |
Sarsfield Mineralised Waste |
0 |
0.0 |
0 |
0 |
0.0 |
0 |
32,600 |
0.4 |
390 |
32,600 |
0.4 |
390 |
Open Pit Sub Total |
76,430 |
0.8 |
1,940 |
82,150 |
0.7 |
1,780 |
108,950 |
0.6 |
1,930 |
267,530 |
0.7 |
5,650 |
Mt Wright |
90 |
3.6 |
10 |
0 |
0.0 |
0 |
470 |
3.6 |
60 |
560 |
3.6 |
70 |
Welcome Breccia |
0 |
0.0 |
0 |
0 |
0.0 |
0 |
2,040 |
3.2 |
210 |
2,040 |
3.2 |
210 |
Underground Sub Total |
90 |
3.6 |
10 |
0 |
0.0 |
0 |
2,510 |
3.3 |
260 |
2,600 |
3.3 |
270 |
Total |
76,520 |
0.8 |
1,950 |
82,150 |
0.7 |
1,780 |
111,460 |
0.6 |
2,200 |
270,120 |
0.7 |
5,920 |
Table 1: Mineral Resources
Notes: 1. Mineral Resources include Ore Reserves. Differences may occur due to rounding.
2. Resources are reported above 0.3g/t cut-off for Sarsfield/Nolans and Buck Reef West.
3. Mt Wright Reserves and Resources are reported above 2.3g/t cut off.
Ore Reserves
Mining studies, metallurgical test work and engineering studies undertaken during the first half of 2019 as part of the ongoing strategic review of the REP focused on optimisation and potential for increased throughput driving improved production and cost outputs.
The REP optimisation work has identified opportunities to expand annual mill throughput and gold production through developing and mining the Buck Reef West, Sarsfield and Nolans East orebodies via:
· Bulk, open-pit mining with large mobile fleet classes;
· Rejection of waste (beneficiation) from Sarsfield-Nolans ore prior to milling;
· Expanding milling capacity of the existing process plant, in two stages, from 2.8Mtpa to 5.0Mtpa and then to 7.1Mtpa;
· Extending and expanding the existing Nolans Tailings Storage Facility to store process tailings, including those currently stored in the Sarsfield open pit;
· Accessing the Sarsfield open pit through redeposition of in-pit tailings; and
· Low-cost owner-operated mining.
This work has formed the basis for an updated Ore Reserve estimate for Ravenswood. The new Ore Reserve stands at 115.4Mt at 0.7g/t Au for 2.7Moz of gold. The classification and location of the new Ore Reserves are presented in Table 2.
ORE RESERVES |
PROVED |
PROBABLE |
TOTAL |
As at 30 June 2019 |
Tonnes |
Grade |
Ounces |
Tonnes |
Grade |
Ounces |
Tonnes |
Grade |
Ounces |
(000s) |
(g/t) |
(000s) |
(000s) |
(g/t) |
(000s) |
(000s) |
(g/t) |
(000s) |
Sarsfield/Nolans |
47,450 |
0.8 |
1,170 |
42,640 |
0.7 |
890 |
90,100 |
0.7 |
2,060 |
Buck Reef West |
19,670 |
0.9 |
540 |
5,520 |
0.7 |
130 |
25,190 |
0.8 |
670 |
Open Pit Sub Total |
67,120 |
0.8 |
1,710 |
48,170 |
0.7 |
1,020 |
115,290 |
0.7 |
2,730 |
Mt Wright |
70 |
2.2 |
5 |
0 |
|
0 |
70 |
2.2 |
5 |
Underground Sub Total |
70 |
2.2 |
5 |
0 |
0.0 |
0 |
70 |
2.2 |
5 |
Total |
67,190 |
0.8 |
1,720 |
48,170 |
0.7 |
1,020 |
115,360 |
0.7 |
2,740 |
Table 2: Ore Reserves
Notes: 1. Mineral Resources include Ore Reserves. Differences may occur due to rounding.
2. Reserves are reported above 0.3g/t cut-off for Sarsfield/Nolan and Buck Reef West.
3. Mt Wright Reserves and Resources are reported above 2.3 g/t cut off.
4. The Ravenswood Expansion Project assumed a gold price of US$1,275/oz.
Resolute is evaluating the identified opportunities to increase mining and processing rates as the optimal development plan for the extremely large low-grade gold deposits at Ravenswood. The broad disseminated nature of the gold mineralisation at Ravenswood lends itself to non-selective bulk mining strategies which are in turn very low risk due to the robust resource models. The expected reduction in mining and processing costs associated with the proposed expansion has enabled a lower cut-off grade to be used and has significantly increased the gold inventory available for open pit mining.
A unique advantage of gold mineralisation at Ravenswood is that the gold content per tonne can be upgraded by beneficiation crushing and screening by size. The beneficiation of gold is related to preferential comminution and liberation which occurs due to the contrast of high strength barren host rock and soft, or brittle, gold bearing veins. The beneficiation results of low-grade crushed ore products conclude that approximately half of the rock can be rejected as waste, with approximately 5% loss of the contained gold. The beneficiation process targets the rejection of barren host rock at a nominal size of 50mm. As such, a run of mine (ROM) grade of 0.7g/t Au can result in a mill feed grade of 1g/t Au after beneficiation.
Open pit mine optimisation and design work conducted during 2019 resulted in final pit shells which encompass a much greater portion of the Ravenswood gold mineralisation than that included in the Ore Reserve Statement as at 31 December 2018 and the earlier REP studies. The overlay of pit designs with orebody block model is set out in Figure 1 above. The recoverable mine inventory has increased significantly with only a nominal decrease in average mined grade. The pit design was scheduled using Deswik software with the key criteria based on delivering a nominal 7Mtpa of post-beneficiated ore to the ROM.
Ravenswood Expansion Project Strategic Review
The updated Ore Reserve and Mineral Resource for Ravenswood supports Resolute's ongoing strategic review and optimisation study work. As part of Resolute's preparation for the REP, the Company has undertaken various activities including funding and development of a new State School, drilling of previously underexplored areas between the Sarsfield and Buck Reef West pits, examination of enhanced crushing and milling strategies, and the redesign and re-optimisation of the open pits. In late 2018, the Company commissioned a new beneficiation circuit as part of the existing Nolans Processing Plant. This circuit has demonstrated, on a commercial scale, Resolute's ability to upgrade low grade ores via simple two-stage crushing and screening.
The Company is expecting to conclude the REP strategic review during calendar 2019 and will update the market with completed study work and decisions on capital commitments and project timing and funding immediately the review is concluded.
Competent Persons Statement
The information in this announcement that relates to the Mineral Resource estimate is based on, and fairly represents, information and supporting documentation compiled by Mr Bruce Mowat, a Competent Person who is a Member of the Australian Institute of Geoscientists. Mr Mowat is a full-time employee of Resolute Corporate Services Pty Ltd, a wholly owned subsidiary of Resolute Mining Limited. Mr Mowat has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr Mowat consents to the inclusion in the report of the matters based on his information in the form and context in which they appear.
The information in this announcement that relates to the Ore Reserve estimate is based on, and fairly represents, information and supporting documentation prepared by Mr David Mackay, a Competent Person who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Mackay is a full-time employee of Carpentaria Gold Pty Ltd, a wholly owned subsidiary of Resolute Mining Limited. Mr Mackay has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr Mackay consents to the inclusion in the report of the matters based on his information in the form and context in which they appear.
For further information, contact:
John Welborn Managing Director & CEO |
Jeremy Meynert General Manager - Business Development & Investor Relations |
Contact Information
Resolute
John Welborn, Managing Director & CEO
Jeremy Meynert, General Manager - BD & IR
Telephone: +61 8 9261 6100
Email: [email protected]
Web: www.rml.com.au
Berenberg (UK Corporate Broker)
Matthew Armitt / Detlir Elezi
Telephone: +44 20 3207 7800
Tavistock (UK Public Relations)
Jos Simson / Charles Vivian / Emily Fenton / Annabel de Morgan
Telephone: +44 207 920 3150 / +44 778 855 4035
Email: [email protected]
About Resolute
Resolute is a successful, dividend paying gold miner with more than 30 years of experience as an explorer, developer and operator of gold mines in Australia and Africa which have produced more than 8 million ounces of gold.
Resolute currently owns three gold mines. Its flagship asset is the world class Syama Gold Mine in Mali (Syama) which can produce more than 300,000 ounces of gold per annum from existing processing infrastructure. Resolute is currently commissioning the world's first fully automated underground mine at Syama which will deliver a low cost, large scale operation with a mine life beyond 2032. Alongside Syama, Resolute owns the Ravenswood Gold Mine in Australia and the Bibiani Gold Mine in Ghana. Resolute has a pathway to annual gold production in excess of 500,000 ounces from a Global Mineral Resource base of more than 17 million ounces of gold.
ASX/LSE:RSG Capital Summary Fully Paid Ordinary Shares: 758,094,588 Current Share Price: A$1.74 as at 19 July 2019 Market Capitalisation: A$1.32 billion FY19 Guidance (to 30 June): 300,000oz @ AISC US$960/oz (A$1,280/oz) |
Board of Directors Mr Martin Botha Non-Executive Chairman Mr John Welborn Managing Director & CEO Ms Yasmin Broughton Non-Executive Director Mr Mark Potts Non-Executive Director Ms Sabina Shugg Non-Executive Director Mr Peter Sullivan Non-Executive Director |
Contact John Welborn Managing Director & CEO Jeremy Meynert GM - BD & IR Level 2, Australia Place | 15-17 William St Perth, Western Australia 6000 T: +61 8 9261 6100 | F: +61 8 9322 7597 E: [email protected] |