- Basis of preparationFY · older filing
- Going concern
- Material uncertainty
- None disclosed
- Viability statement horizon
- 2 years
| Disclosure | Value |
|---|---|
| Disclosure | Value |
|---|---|
Contractual cash flows, undiscounted — these include future interest and so exceed the carrying amounts above.
| Facility | Size | Drawn | Undrawn | Matures |
|---|---|---|---|---|
| Revolving Credit Facility | £700m | £700m | £81m |
Extracted from filed annual reports. Disclosures are point-in-time and each section is labelled with the financial year it came from; always check the source document before acting on anything here.
Contractual cash flows, undiscounted — these include future interest and so exceed the carrying amounts above.
| Facility | Size | Drawn | Undrawn | Matures |
|---|---|---|---|---|
| Revolving Credit Facility | £700m | £700m | £81m |
Extracted from filed annual reports. Disclosures are point-in-time and each section is labelled with the financial year it came from; always check the source document before acting on anything here.